This phase follows the making of the mould: first of all, the mould is treated with a special soap used to detach different pieces of the mould, then the required amount of plaster mixed with water for filling in the mould is prepared.
After plaster casting and drying, the stripping phase serves for testing the mould and for any casting tests.